Графични страници
PDF файл
ePub

CREDIT.

Funded debt....

Capital stock.

Advances by Chicago, Burlington & Quincy R. R. Co.
Bills receivable and payable balance.

Profit and loss and income account.

Total...

[ocr errors][merged small][merged small][merged small]

sive of sidings.

DESCRIPTION OF ROAD.

Length main line of road from Keokuk to St. Peters
Length main line of road in Iowa.

Length main line of road in Missouri
Length main line of road in Illinois.

Total length of road belonging to this company.

[ocr errors]

Total length of road belonging to this company in Iowa... Aggregate length of sidings and other tracks not above enumerated...

Same in Iowa.

Aggregate length of track, computed as single track, exclu

Same in Iowa.

[blocks in formation]

Total length of steel rails in tracks in Iowa, exclusive of sidings

3.02

Total length of iron rails in tracks in Iowa, exclusive of

sidings

[merged small][ocr errors]

Weight per yard, steel, 66 pounds.

Weight per yard, iron, 56 pounds.

Guage of track, 4 feet, 8 inches.

ROAD AND BRANCHES BELONGING TO OTHER COMPANIES, OPERATED BY THIS COMPANY UNDER LEASE OR CONTRACT.

Name, description and length of each.

Keokuk & Northwestern R'y Co., Keokuk to Mt. Pleasant

Total length of above road in Iowa..

49.05

49.05

The Keokuk & Northwestern is leased to the St. L., K. & N. W. R'y Co., and the latter road assumes the indebtedness of the former and in consequence shows in its balance sheet the stock and bonds of the K. & N. W. as a liability and the cost of the road as an asset.

By the terms of the lease the St. L., K. & N. W. R'y Co. pays all operating expenses and keeps in good repair the K. & N. W. The St. L., K. & N. W. R'y Co. retains all the earnings of the K. &. N. W. and pays 30 per cent of the same as rental.

For these reasons there are no separate accounts kept for the K. & N. W.. except that from time to time the earnings of the K. & N. W. are separated from those of the total line, and the K. & N. W. is treated as if it were part and parcel of the St. L., K. & N. W. R'y.

[ocr errors]

Total miles of road operated by this company.
Total miles of road operated by this company in Iowa.

184.87

52.07

STATIONS.

Number of stations on all roads owned by this company.
Same in Iowa..

Number of stations on all roads operated by this company.
Same in Iowa..

Number of telegraph offices in stations in Iowa..

[subsumed][subsumed][subsumed][subsumed][ocr errors]

D

EMPLOYES.

Number of persons regularly employed on all roads operated by

this company.

Same in Iowa.....

800 300

Amount paid employes, including officials on all
roads operated by this company.

[blocks in formation]

Same in Iowa..

162,890.00

[blocks in formation]

Amount of timber used in renewals of wooden bridges dur-
ing the year [feet B. M....

Amount of trestle work replaced with earth during the year
[lineal feet].

[ocr errors]

76

[blocks in formation]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][ocr errors][merged small][merged small][ocr errors][merged small][ocr errors][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][ocr errors][merged small][merged small][ocr errors][ocr errors][merged small][merged small][ocr errors][ocr errors][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small]

Give the average number of years the trestle bridges last on
your road in Iowa...

9

Give the average number of years that wooden truss bridges
last on your road in Iowa, uncovered......

8

ROAD-BED AND TRACK.

[ocr errors]

Number of track sections in Iowa...
Average length of sections, miles.
Average number of men in each section gang.
Number of new ties laid in track during the year in Iowa..
Average number of new ties per mile of road.

[ocr errors]

Rails laid in track during the year in Iowa-iron (39.76 tons) miles..

New rails laid in track during the year in Iowa-steel (17.50 tons), miles...

What is the average number of years that iron rails last in your track on main line in Iowa..

What is the average number of years that iron rails last in your track on branches in Iowa..

What is the average number of years that steel rails last in your track on main line in Iowa..

What is the average number of years that ties last in your track in Iowa....

8,423

100

.43

.17

10

10

12

8

CROSSINGS IN IOWA.

What railroad crosses your road at grade, and at what locality.

C. B. & K. C. R'y at Donnellson.

C., R. I. & P. R'y at Keokuk.

What railroads cross your road, either over or under, and at what locality. Under-Ft. Mad. & N. W. R. R. near Haughton.

Number of highway crossings at grade.

[ocr errors]

Number of highway crossings at which there are flagmen..

Number of highway crossings over railroad.

Number of highway crossings under railroad.

Number of highway bridges 18 feet above track.

Number of highway bridges less than 18 feet above track...

[merged small][merged small][merged small][merged small][ocr errors][merged small]

FENCING IN IOWA.

How many miles of your road in Iowa are fenced.
What is the average cost per rod, cents.

What is the total cost of same.

86.50 .95

21,202.50

Give the number of miles needed on both sides of your track in Iowa....

How many miles of new fencing have you built during the year

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small]

Maximum weight of locomotives and tenders (tons).
Average weight of locomotives and tenders (tons).
Number of locomotives equipped with train brake.
Kind of brake. Westinghouse air..

Mamimum weight of passenger cars (tons).
Average weight of passenger cars (tons).
Number of cars equipped with train brake.
Kind of brake. Automatic..

[ocr errors]

Number of passenger cars equipped with Miller platform and buffer.

The amount of tonnage that can be carried over your road exclusive of cars, by an engive of given weight. Weight of engine 50 tons; (tons)..

MILEAGE, TRAFFIC, ETC.

[merged small][merged small][ocr errors][subsumed][subsumed][subsumed][merged small][merged small][merged small]

TRAIN MILEAGE.

Miles run by passenger trains during the year.
Miles run by freight trains during the year.
Miles run by other trains during the year.

Total train mileage.

CARS AND WEIGHT OF TRAINS.

Average number of cars in passenger trains.

Average weight of passenger trains, exclusive of passengers, tons

Average number of cars in freight trains..

Average weight of freight trains, exclusive of freight, tons

[merged small][merged small][merged small][merged small][merged small][merged small][ocr errors]

PASSENGER TRAFFIC.

Total number of passengers carried....
Total passenger mileage, or passengers carried one mile.
Average distance traveled by each passenger, miles...
Average amount received from each passenger, cents.
Highest rate of fare per mile for any distance, cents.

[blocks in formation]
[merged small][merged small][ocr errors][merged small][ocr errors][merged small][merged small][merged small]

Total mileage of through freight (tons carried one mile)....
Total mileage of local freight (tons carried one mile)

28,691,790

1,827,140

Total freight mileage, or tons carried one mile.....

CAR MILEAGE.

30,518,930

[merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small]

SPEED OF TRAINS IN IOWA.

Rate of speed of passenger trains, including stops*.
Rate of speed of freight trains, including stops..

[blocks in formation]

10.77 10.31

PER

TONS.

CENT.

71,476

20.

10,721

3.

[blocks in formation]

28,590

8.

[blocks in formation]

53,607

15.

25,017

7.

10,721

3.

[blocks in formation]

10,721

3.

[blocks in formation]

Manufactures-articles shipped from point of production
Merchandise, and other articles not enumerated above....

Total tons carried...........

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors]

Plaster, lime, cement, salt, petroleum and oil, iron, steel, castings, stone, brick, manufactures-articles shipped from point of production, merchandise and other artinot enumerated above..

Total tons carried......

ADDITIONAL QUESTION.

PER

TONS.

CENT.

23,710

20.

1,185

1.

9,484

8.

11,855

10.

1,185

1.

23,710

20.

11,855

10.

[blocks in formation]

EXPRESS COMPANIES.

What express companies run on your road, and on what terms, and what conditions as to rates, etc.; what kind of business is done by them, and do you take their freights at the depot, or at the office of such express company? American Express Company; $50 per working day for 4,000 pounds of through freight daily, any excess charged at rate of $1 per 100 pounds through freight. Express company takes freight at depot and loads and unloads and cares for same. From July 1st to November 1st the United States Express Company used the road under the same contract as above.

*Rate of speed of passenger trains is low from fact that K. & N. W. branch train is an ascommodation train.

« ПредишнаНапред »