Страница 153
... permanent work ; $ 80.11 or 0.6 % was spent for temporary work ; $ 1,753.44 ... permanent , temporary or natural grades , and no roads were surfaced . The county road system was dragged an ... bridges ROAD AND BRIDGE EXPENDITURES 153.
... permanent work ; $ 80.11 or 0.6 % was spent for temporary work ; $ 1,753.44 ... permanent , temporary or natural grades , and no roads were surfaced . The county road system was dragged an ... bridges ROAD AND BRIDGE EXPENDITURES 153.
Страница 154
Iowa. General Assembly. Of the total amount $ 12,174.76 spent for new bridges and culverts $ 11 , - 706.22 or 96.1 % was spent for permanent work ; $ 468.54 or 3.9 % was spent for temporary work . The amounts last above referred to were ...
Iowa. General Assembly. Of the total amount $ 12,174.76 spent for new bridges and culverts $ 11 , - 706.22 or 96.1 % was spent for permanent work ; $ 468.54 or 3.9 % was spent for temporary work . The amounts last above referred to were ...
Страница 172
... permanent work ; $ 3,455.49 or 11.7 % was spent for temporary work ; $ 7,147.25 or 24.1 % was spent for repairs ... Bridges . The total expenditures for bridge and culvert work during 1919 were $ 53,085.80 of which $ 20,321.35 or 38.3 % was ...
... permanent work ; $ 3,455.49 or 11.7 % was spent for temporary work ; $ 7,147.25 or 24.1 % was spent for repairs ... Bridges . The total expenditures for bridge and culvert work during 1919 were $ 53,085.80 of which $ 20,321.35 or 38.3 % was ...
Съдържание
Summary of road work and expenditurescontinued | 243 |
Clayton County | 208 |
Dubuque County | 214 |
4 други раздела не са показани
Други издания - Преглед на всички
Често срещани думи и фрази
amounts last Appvd bridges and culverts built to permanent Cedar Rapids Chicago Colfax Commission concrete abutments corrugated pipe county road expenditure county road system County-Federal Aid cubic yards culvert material Davenport Dubuque equipment and unused Excav expenditure per mile expenditures for bridge Federal Aid Project filling bridges headwalls highway I-beam Illinois Central R. R. Iowa last above referred Louis R. R. Mason City material for townships mile of county miles of earth miles were built Milwaukee & St Minn Minneapolis & St Moines Muscatine Nash Quad two-ton Number Oskaloosa paving permanent bridges permanent grade Pierce-Arrow pile bridges Quincy R. R. railroad shown by reports Sioux Sioux City spent for construction spent for equipment spent for maintenance spent for permanent spent for repairs spent for special spent for temporary spent for tiling temporary bridges tiling and drainage total average expenditure total county road total expenditure Union Pacific R. R. unused materials