... earth roads not built , 22.5 miles of earth road built to permanent grade and 3 miles surfaced with gravel . 2. County Roads . The total county road expenditure was $ 33,466.60 , of which $ 3,906.96 or 12 % was spent for construction ...
... earth roads not built , 22.5 miles of earth road built to permanent grade and 3 miles surfaced with gravel . 2. County Roads . The total county road expenditure was $ 33,466.60 , of which $ 3,906.96 or 12 % was spent for construction ...
Страница 253
... mile . On January 1 , 1921 , the county had 8.2 miles of earth roads not built ; 25.2 miles of earth road built to permanent grade , and 31 miles surfaced with gravel . 2. County Roads . The total county road expenditure was ...
... mile . On January 1 , 1921 , the county had 8.2 miles of earth roads not built ; 25.2 miles of earth road built to permanent grade , and 31 miles surfaced with gravel . 2. County Roads . The total county road expenditure was ...
Страница 259
... miles of earth road maintained at a cost of $ 7,473.65 or an average of $ 166.82 per mile . There were 4 miles of gravel road maintained at a cost of $ 15.53 or an average of $ 3.88 per mile . The entire system , consisting of 48.8 ...
... miles of earth road maintained at a cost of $ 7,473.65 or an average of $ 166.82 per mile . There were 4 miles of gravel road maintained at a cost of $ 15.53 or an average of $ 3.88 per mile . The entire system , consisting of 48.8 ...
Съдържание
Summary of road work and expenditurescontinued | 243 |
Clayton County | 208 |
Dubuque County | 214 |
4 други раздела не са показани
Други издания - Преглед на всички
Често срещани думи и фрази
amounts last Appvd bridges and culverts built to permanent Cedar Rapids Chicago Colfax Commission concrete abutments corrugated pipe county road expenditure county road system County-Federal Aid cubic yards culvert material Davenport Dubuque equipment and unused Excav expenditure per mile expenditures for bridge Federal Aid Project filling bridges headwalls highway I-beam Illinois Central R. R. Iowa last above referred Louis R. R. Mason City material for townships mile of county miles of earth miles were built Milwaukee & St Minn Minneapolis & St Moines Muscatine Nash Quad two-ton Number Oskaloosa paving permanent bridges permanent grade Pierce-Arrow pile bridges Quincy R. R. railroad shown by reports Sioux Sioux City spent for construction spent for equipment spent for maintenance spent for permanent spent for repairs spent for special spent for temporary spent for tiling temporary bridges tiling and drainage total average expenditure total county road total expenditure Union Pacific R. R. unused materials