Графични страници
PDF файл

performed in the Royal Carriage Department—continued. ARMY. NAVY. INDIA. No. Cost. No. Cost. Sub-head. Extract. No. Cost. £. s. d £. s. d £. s. d 6 35 2 2 *|| 150 14 2 2 |s 24 36 8 10 10 15 12 10 10 15 12 10 44 17 17 4 172,128 6 - - - - - 17,126 – 8 2,102 671 11 6 - - 1,500 32 18 4 I. 50 23 9 3 t - - 1,200 20 2 11 I. - - 700 459 5 - I. - - 2,000 || 47 14 – I. - - 50 83 19 8 H - - 183 194 5 2 H. - – 30 31 6 1 H.

Cost (in accordance with note on page 1) of work

TOTAL. HD ESC RIPTION. -No. , Rate. Cost. +- | | | | CORDITE, GUNPOWDER, &c.—continued. £. s. d. | Per £. s. d. Cases, packing icontinued. : Torpedo primers: B. and C., for 6- . . . . . . 30 - 3 10} | Each 5 6 2 Handles, copper wire - - - - 100 + – 54 ** 2 4 9 B. and C., for 12: Handles, copper wire - - - - 250 – – 54 *** 5 11 11 E., for 6 - - - - - - 25 – 3 6 -> 4 7 5 Cases, powder, metal lined : Half powder, naval : Handles, copper wire - - - - 2,200 + – 5} -- 47 6 4 Quarter: Bungs - - - - - - - 80 - - 10} » 3 19 7 Quarter, naval : Handles, copper wire - - - - - 1,800 — — 54 ** 38 14 3 Whole : Bungs - - - - - - - 30 – 1 3} x - 1 19 8 Rings and Studs - - - - - - 600 — — 4 :- 11 7 6 Drums, cordite transport, Mark I. - - - 999 f– 5 2; -> 261 2 6 Cost of stores and instructional prints for conversion of boxes, cartridges, impulse torpedo - - - - - 500 8 2 Itepairing and altering stores - - - - - - - - 13,699 5 6 Completing, painting, &c., where necessary - - - - - 3S 10 7 TOTAL - - - - 16,184 7 3 PROJECTILES : Boxes: Projectile : B.L.: Common, lyddite: 8-inch - - - - - - - 642 – 6 - | Each 193 2 8 8-inch special, for Marks VII. and VIIA. guns - - - - 68 – 6 5; * > 22 1 – 7.5-inch - - - - - 600 – 5 8; xx 171 13 10 B.L., Q.F., or Q.F.C. : Common, lyddite : 6-inch - - - - - - 600 – 4 23 >> 126 13

+ Including special expenditure for tools, etc.

performed in the Royal Carriage Department—continued.
ARMY. NAVY. INDIA.
No. Cost. No. Cost. Sub-head. Extract. No. Cost.
£. s. d. £. s. d. £ s. d

- -- 30 5 6 2 H.
- - 100 2 4 9 I.
- - 250 5 11 11 I.
- - 25 4 7 5 H.
- - 2,200 47 6 4 I.
- - 80 3 10 7 I.
- - 1,800 38 14 3 I.
- -- 30 1 19 8 I.
- - 600 11 7 6 I. :
999 261 2 6 -
- - - 500 8 2 H.
- 4,528 2 – - 9,171 : I.

- – 13 9 H.
- 15 16 — - { 22 – 10 I.
— 5,500 l 3 – 10,684 6 —
642 193 2 8
68 22 1 –
600 171 13 10
600 126 13 –

Cost (in accordance with note on page 1) of work

TOTAL. DES C R IPTION. No. Rate. Cost. PROJECTILES-continued. £ s. d. Per £ s. d Boxes---continued. Projectile—continued. ! B.L., star, 6-inch howitzer - - - - - 120 – 3 84 | Each 22 3 11 Q.F., common, lyddite, 4.7-inch - - - 300 – 3 3} 33 49 5 9 Pieces, packing, wood - - - - 4,000 1 6 7 100 53 3 8 Repairing and altering stores - - - - - - - - 893 2 6 | | TOTAL - - - - 1,531 6 4 GUN CARTRIDGES, FUZES AND TUBES. Boxes, ammunition: Q.F. : 18-pr. ; - . Mark I., to hold 4 cartridges - - | 18,965 – 10 63 | Each ||10,023 3 6 Transport, experimental, wood, tinlined, to hold 4 - - - - 4 – 12 93 15 2 11 3 13-pr., to hold 4 rounds - - - - 5,302 – 10 –? o 2,657 3 1 6-pr. ; i Linings, zinc : Bottoms, wood, sectional SetS 3,000 — – 93 Set 122 16 8 Diaphragms: Bottoms - - - - 200 — 7# | Each 6 9 6 Tops - - - - - 200 — 73 22 6 9 6 Plates, zinc, securing bottoms sets 2,200 — — 4} Set 40 18 8 6-pr., special : Mark III. - - - - - - 50 1 1 3} | Each 53 4 9 Linings, short . - - - - 50 – 5 9} 3: 14 9 6 Pieces, packing : Stools, loose - - - 50 — 1 6 22 3 15 4 “Swiftsure " - - - 200 — 1 24 y: 12 – 1 “Triumph” - - - - 207 — 1 2; py 12 8 5 3-pr. and 6-pr. ; Handles, copper wire - - - - || 4,000 — — 5% >> 96 15 3 Hinges, metal - - - - - 50 — 1 23 >> 3 2 1 Rivets, copper - - - - - 7,000 – 10 13 || 1,000 3 10 10 Washers, copper- - - - - || 7,000 – 5 —; -> 1 15 6

performed in the Royal Carriage Department—continued. ARMY. NAVY. INDIA. No. Cost. No. Cost. Sub-head. Extract. No. Cost. 4. s. d £. s. d s. d. 120 22 3 || 1 300 49 5 9 4,000 53 3 S - 324 16 6 - 568 6 I. - 963 – 4 - 568 6 - - C. 31 2 1 1 1 18,963 |10,022 2 5 - - - 2so 4 2 11 3 - - C. 34 ...) 1 – 1 5,300 2,656 3 – - - - 116 | - - 3,000 | 122 16 S I. | | - - 200 6 9 (; I. – - 200 (; 9 (5 I. - - 2,200 40 1s 8 I. - - 50 53 4 9 I. - - 50 14 9 6 I. - - 50 3 15 4 I. - - 200 12 – 1 I. - - 207 12 S 5 I. - - 4,000 96 15 3 I. - - 50 3 2 1 I. - - 7,000 3 10 10 I - - 7,000 1 : 5 ($ I.

« ПредишнаНапред »